Home > Projects

Malaysia 30t/d crude fish oil refinery plant

Date:Nov 10th, 2020
Install Place: Malaysia
Date: June, 2018.
Install Place: Malaysia
Raw material: Our customer import crude fish oil from Africa and South America, refine it by our refinery equipment, and then sell to China Company for deeper production.
Production Line: 30tpd continuous crude fish oil refinery plant (include alkali refining, degumming, bleaching, deodorization, most of pumps are Grundfos, Netzsch, the centrifugal separator is made by Alfa Laval).
Delivery time: 45 days after deposit received.
Installation time: 45 days after equipments arrived customer site.
Adavantage:
We provide installation, commissioning, and training services, now the production line is runing smoothly. Customer is very satisfied with our job and equipment. We still keep touch with each other and are talking about larger capacity of refinery.
Packing & Shipping:
Customer Site:
Share:


TOP